ende

2017
27
May

Repairs

The downwind passage from the Gambier to Tahanea with quite a windy start put lots of strain on the material. We bent a stanchion and one of the genoa poles actually ripped the pole track out of the mast (a 15 cm long bit, we could still use the other pole). Christian has already cut out the bent bit and will move the remaining piece… Continue reading »